Crackenthorpe Retaining Wall
This contract involved the stabilization of a section of the A66 Crackenthorpe trunk road.
Gallery (click on an image to view a larger version)
The work involved the construction of a 150m long buried retaining wall using 900mm diameter in-situ bored and cast reinforced concrete piles embedded to a maximum depth of 27m. The piles were finished with a reinforced concrete capping beam.
| Client | Highways Agency |
| Contract | A66 Crackenthorpe |
| Value | £2m |
| Duration | 18 weeks |