MES&T Building
The facility is purpose built to offer office accommodation and laboratory space in a new Materials Engineering Support and Test (MEST) single storey building.
Gallery (click on an image to view a larger version)
The facility covers an area of approximately 1000m² and provides materials analysis and evaluation associated with metallurgy, composite materials, non-metallic materials, chemistry, mechanical test, NDT and instrumentation in support of the MAS Manufacturing, Engineering and Main operating Bases.
This project was completed to a BREEAM Very Good rating.
| Client | BAE Systems |
| Location | Samlesbury |
| Duration | 35 Weeks |
| Completion | August 2009 |
| Value | £1.7 million |