You are here: home : case studies : offices : daresbury park development, cheshire
   
introduction
civil engineering
education
health
industrial
offices
refurbishment
residential
retail
sports and leisure

case studies

Offices : Daresbury Park Development, Cheshire


Client: Joint Venture between Maple Grove
Developments and De Vere Group plc
Completion: March 2003
Duration: 18 months Value: £30 million to date
Form of Contract: JCT 98 with Contractors Design Size: 250,000 sq ft to date
Assignment: Design and Build Architect: Leach Rhodes & Walker

Daresbury Park Development, Cheshire
Daresbury Park Development, Cheshire

The Daresbury Park Development is located in naturally undulating Cheshire countryside and has planning consent for 1.6 million sq ft of office and related facilities.

To date, approximately 250,000 sq ft has been completed with further work progressing.

The site is situated on junction 11 of the M56, one of the northwest regions main arteries, linking Chester in the west with Manchester and its airport in the east.

Development work includes the infrastructure, drainage, hard and soft landscaping as well as the construction works for individual buildings for Aegon UK, Eutech, Vistorm, BNFL and De Vere Hotels & Leisure.

As part of the master planning of the park additional facilities will include up to 10,000 sq ft of shopping, a business centre offering flexible space alternatives and a crèche.

 
Download PDFDownload this case study in PDF format

Get Adobe Reader

toptop of page    previous pageprevious page print pageprint